Today, the first pouring of high-performance concrete bridge deck in the new year has begun, which is highly valued by the company leaders and test departments.
Inspection of raw materials: the test department shall inspect the raw materials as required, and only qualified raw materials can be used for production;
Production operation supervision: the mixing process must be produced according to the high-performance production process;
Control of the current situation of exit: each truck of concrete is strictly inspected before leaving the factory, which meets all concrete indexes;
Vehicle transportation scheduling: use GPS system to supervise vehicles and monitor vehicle transportation status in real time;
On site pouring: professional operators and specialists shall feed back the pouring concrete conditions in real time to make timely adjustment.
Pay attention to the whole process, assign special personnel to control the environment, and strive to be foolproof. At the end of the pouring task, it was highly recognized by the construction site.